Maintaining and increasing production of the Ramshir package/Constructing a production complex, boosting gas pressure and desalination along with an oil and gas pipeline to transport Ramshir oil and gas.

In order to maintain and increase production from the Ramshir field, the National Iranian Oil Company/National Southern Oil Regions Company has put on the agenda “the construction of a new Ramshir oil and gas processing and gathering complex (with an exploitation/desalination capacity of 55 HPP and a gas pressure boosting station), pipelines and necessary ancillary facilities.”

Consultant: Hirgan Energy Engineering Company

Client: National Southern Oilfields Company/Oil Industries Engineering and Construction Company (OIEC)

In order to maintain and increase production from the Ramshir field, the National Iranian Oil Company/National Southern Oil Regions Company has put on the agenda “the construction of a new Ramshir oil and gas processing and gathering complex (with an exploitation/desalination capacity of 55 hbar and a gas pressure boosting station), pipelines and necessary ancillary facilities”, and in this regard has assigned the relevant EPC activities to the Oil Industries Engineering and Construction Company (OIEC). The Oil Engineering and Construction Company has also assigned the engineering services of the above-mentioned work packages to Hirgan Energy Engineering Company (as the project design consultant). The relevant engineering services include the approval of preliminary studies, detailed design and procurement engineering.

خدمات موضوع قرارداد

  • Oil and gas processing and gathering system with a exploitation/desalination capacity of 55 HPP
  • Gas pressure boosting station
  • Pipelines and required ancillary facilities
  • Validation of preliminary studies
  • Detailed design
  • Procurement engineering services as a project design consultant including conceptual/preliminary studies, detailed design and procurement engineering