
CRU Unit Furnace Optimization Project (EPC)
Isfahan Oil Refining Company has awarded the above project to Hirgan Energy Company as EPC with the aim of optimizing the furnaces of the CRU unit and in order to recover energy from the gases resulting from combustion and reduce the temperature of the furnace gases. In the current situation, these gases enter the atmosphere at a temperature of about 900℃, so these gases can be used to preheat the boiler water (from 117℃ to 240℃) with the aim of heat recovery with environmental standards by using an Economizer.
EPC Contractor
Hirgan Energy Engineering Company
Employer
Isfahan Oil Refining Company






