Feasibility study

1.Techno-economical study
2.Choice selection

Conceptual, Basic and detail design for conventional process

1. Process & Safety
      1.1. Simulation
      1.2. Process flow diagram
      1.3. Main equipment sizing
      1.4. Safety and control valve data sheet
      1.5. Hydraulic design (line sizing, pipe line calculation)
      1.6. Exchanger thermal rating 
      1.7. Flare network design
      1.8. P&ID preparation
      1.9. Duty specification for package units
      1.10. Hazard and operability study (HAZOP)
      1.11. Health / Safety and Environmental (HSE)

 2. Civil & Structure
      2.1. Technical & Non-technical buildings architectural design
      2.2. Steel and R.C. structures analysis & design
      2.3. Equipment foundation analysis & design
      2.4. Roads, grading, drainage & sewerage analysis & design
      2.5. Design criteria and construction specifications

 3. Mechanical
      3.1. Mechanical data sheets
      3.2. Specifications & criteria
      3.3. Mechanical drawings

 4. Piping
      4.1. Plot plan & Key plan
      4.2. Piping arrangement & ISO drawings
      4.3. Specifications & criteria
      4.4. Stress analysis & support
      4.5. Hydrotest diagram

 5. Electrical & Telecommunication
      5.1. Specifications & criteria
      5.2. Calculations
      5.3. Single line diagrams
      5.4. Data sheets & load lists
      5.5. Lighting system
      5.6. Earthing & lightning systems
      5.7. Cable schedule
      5.8. Communication network

 6. Instrument & Control
      6.1. Calculations
      6.2. Specifications & criteria
      6.3. Data sheets
      6.4. Loop diagrams
      6.5. Control / ESD / F&G configuration diagrams
      6.6. Instrument/F&G location layout

Site Supervision, Engineering Services & Construction Management.

1. Construction engineering
2. Site survey
3. Site supervision

Manufacturing Supervision and Inspection

5.1. Manufacturing supervision
5.2. Manufacturing inspection
5.3. Vendor & supplier inspection

Procurement technical services

1. Material requisition
2. Expedite & technical clarification
3. Technical bid evaluation
4. Vendor data review and checking
5. Purchase & custom clearance